The time has come to build the stud walls and give some more rigidity to my oak frame. We got a delivery of timber and had to move it from the drop off point beyond my gates into my garage where we’d be storing it.
Oli and I did the manual labour since he was on Summer holidays. We started off carry 2 lengths of 4×2. Then I carried 3 pieces in one go. Naturally Oli then had to carry 4. So I moved 5. With 6 pieces of timber left Oli went for it. It all slipped out of his hands and he struggled to get through the gate but he made it in the end. Took him twice as long as if he’d taken them one at a time though
In the past when I’ve been making stud walls I just kind of eyeballed the right angles with varying results. But when I was making my bookcases I started to appreciate the beauty of a proper right angle. So I got some 90 degree clamps. I made use of them on each stud wall I made and they turned out pretty well.
As I put my first nicely square stud wall in it highlighted that the entire frame had shifted at some point and was now kinda leaning backwards a bit. So I dug out some ground anchors and a ratchet strap and brought the frame forwards by a few degrees. The ratchet strap would have to stay in place until I had stud walls everywhere. It was there for a couple of weeks and it was a happy moment when I eventually disconnected the strap and nothing fell over!
The day eventually came when I had all the stud walls in place and I could get rid of the ratchet strap and finally give my grass a proper cut.
It’s difficult to make out in the picture above but I’ve also put the rafters in for my mezzanine. So what’s the first thing everyone does when building a mezzanine? Lob a palette up there and then climb up a ladder onto the wobbly palette then call your son and say “hey look out of your window” and then wave at him from the end of your garden. That’s the first thing everyone does right?