Coming along nicely. All the stud walls are in, the ridge beam is up and all rafters are in place.
The next step will be to put a roof on. One option is a membrane followed by shingles or slates. The other quick and cheap option is to temporarily put some OSB up and felt it, then next Summer do a proper job. After that I’ll have to put a membrane on the walls and then clad to entire building in either Oak, Larch or Cedar.